News for Seattle's Ballard neighborhood and beyond

My Ballard header image 2
 

Ballard Locks pedestrian walkways set for closures tomorrow

Posted by Danielle Anthony-Goodwin on September 2nd, 2014

According to the Chittenden Locks Twitter feed today’s scheduled construction has been postponed until tomorrow.

During tomorrow’s scheduled construction the Lock’s walkways will be closed at 9 a.m. and 1 p.m. with both closures lasting for an hour each.

Closure times (or any changes to them) will be posted on both sides of bridge walkway, shown on the Locks website, Facebook, and Twitter pages, and will also be made available to those who call the Chittenden Locks Visitor Center at (206) 783-7059.

Tags: Ballard   Share

0 reader comments so far ↓

  • There are no comments yet...

Leave a Comment (read our comment rules)






News from the Seattle Times